Helping India's ET Customer Grow: Guoning's Lost Foam Equipment Production Line Project Advances Smoothly

2025-08-22

India's ET customer has considerable influence in the local manufacturing industry. To further expand production scale, improve product quality and production efficiency, they needed an advanced lost foam equipment production line. After multiple inspections and comparisons, ET customer highly recognized our company's technical strength, rich experience in lost foam equipment manufacturing, and sound after-sales service system. Finally, they chose to cooperate with us and ordered a complete set of lost foam equipment production line.

1.jpg

Process Engineer Takes the Lead: Professional Guidance Lays a Solid Foundation for Installation

After the project was launched, our company's process engineers immediately connected with the customer's installation team. They timely provided corrections and guidance for issues such as deviations in installation angles and loose connections between components.After a period of professional guidance, the customer's team successfully completed the installation.

ET打印照片.jpg

Sales Engineer Follows Up: Full-Process Service Ensures Customer Experience

While the process engineer was guiding the installation, the sales engineer arrived at the customer's site, with the core responsibility of providing all-round services to the customer. He communicated with the customer's project manager every day, proactively understanding the customer's needs and confusion during the installation process. Regarding issues of concern to the customer, such as equipment operation training and post-maintenance, the sales engineer sorted out a detailed service list in advance.

微信图片_20250509105845.jpg微信图片_20250509132615.jpg

Electrical Engineer Concludes: Precise Debugging Ensures Efficient Equipment Operation

The electrical system is the "nerve center" of the lost foam equipment production line, and its operation directly affects the overall performance of the production line. When the equipment installation was drawing to a close, the electrical engineer arrived at the customer's site and devoted himself to the installation and debugging of the electrical system.

The electrical engineer made precise connections of the circuits to ensure unimpeded transmission of electrical signals between various devices. During debugging, he repeatedly tested and adjusted every electrical component and every functional parameter to ensure that the equipment could operate safely, stably, and efficiently. For problems found during debugging, he quickly identified the causes and solved them in a timely manner, demonstrating superb professional skills and a rigorous work attitude.

After a period of efforts, the debugging of the electrical system was successfully completed, and all performance indicators of the production line met the design requirements.

IMG_20250531_113211.jpgIMG_20250531_104557.jpg

Project Achievements: Customer Satisfaction and Mutual Benefit

With the close cooperation and hard work of our team, India's ET customer's lost foam equipment production line was successfully put into operation. After commissioning, the lost foam equipment production line operates stably, with significantly improved production efficiency and effectively guaranteed product quality, fully meeting ET customer's production needs.

IMG_20250530_104825.jpg

ET customer spoke highly of the quality and service of our lost foam equipment, and praised the professional quality and dedication of our engineers. Our company will continue to adhere to the concept of "oriented by casting process requirements, and ensuring processes with exclusive design schemes", continuously improve product quality and service levels, provide better lost foam equipment production lines and more professional services for global customers, and work together with customers to create a better future.

IMG_20250530_093711.jpg

 